Place

Montréal

Client

Société de transport de Montréal (STM)

Contract value

4 900 000$

Construction and redevelopment work required for the installation of an elevator at the Jean-Talon station and of two elevators at the Jean-Drapeau station. The elevator installed at the Jean-Talon station connects the blue and orange line levels. The two Jean-Drapeau station elevators connect the entrance level with the platform, one elevator per direction. The work included the construction of utility rooms for the elevators.